For the laying of the pipelines required to supply water to the “Combigolf” power plant in Fos-Sur-Mer, Negri carried out preliminary dredging of nearly 55,000 m3.
This dredging was partly carried out with a 130T dredger and partly with a crane mounted on a pontoon operating a clamshell bucket.
This dredging was carried out under the cover of an anti-pollution dam, thus preserving the mussel beds located at a short distance from the site of the works.

Date
localisation
Fos-sur-Mer, France