previous arrow
next arrow
Slider

Demolition of the footbridges of the mole 3 of the Lavera oil terminal

At mole 3 of the Lavéra oil terminal, removal and demolition of 4 reinforced concrete footbridges of 30 m x 5 m of 200T each in a petrochemical site using the Kinard pontoon. Work carried out during shutdowns with pipelines in operation in the immediate vicinity of the site.

Date
2013
localisation
Lavera, France