Water intake for Cycofos power plant
Design, study, and realization for Alstom of 2 water intakes for power plants in Fos-sur-Mer.
These operations required the adjustment of the bottoms, the assembly, and ballasting of 6 HDPE pipes with diameters of 2000 and 2200 mm, the transfer on-site, the immersion of the pipes, and the construction of the protective shells.
The suction heads were specially designed to comply with very strict environmental and sedimentary constraints.