Water intake for Combigolfe power plant
Design, study, and realization for Alstom of a water intake 2 times 2200 mm for a power plant in Fos-sur-Mer.
This operation included the dredging of 50,000 m3 of sand, the adjustment of the bottom shape, the assembly, transfer, and laying of 2 pipes with a diameter of 2200 mm and a length of 220 meters, then the construction of the protective shell.