108-IMG_2027
108-IMG_1485
108-IMG_1709
108-IMG_2234
108-IMG_2268
108-IMG_2197
108-IMG_1998
108-IMG_1549
previous arrow
next arrow

Rehabilitation of Station B at Mohammedia Oil Terminal

Deconstruction of two damaged dolphins and installation of two new dolphins in an operating oil terminal. Négri completed the work in record time by reusing the foundations of the old damaged dolphins. The work consisted of cutting the metal tube of the old dolphin, curing the concrete inside the old dolphin and finally inserting and sealing the new tube in the foundation of the old dolphin.

Date
2012
localisation
Mohammedia, Morocco