Reconstruction of pier K3/K4 – Lavera oil terminal

The Negri company carried out the demolition and reconstruction of the reinforced concrete superstructures, footbridge, and decks of the K3K4 oil wharf in Lavera in order to rehabilitate these stations then in ruins. For this, the company built on its site in Fos and transported by sea 16 concrete pieces from 35T to 70T, 4 mixed footbridges (steel-concrete) of 28 m from 95T to 110T, and a metal platform of 24 m x 15 m of 60T.

Date
2017 - 2018
localisation
Lavera, France