100-1-DSCN1001
100-2-DSC02451
100-3-DSCN1017
100-4-DSCN1016
previous arrow
next arrow

Laying of the Jai Bridge

Negri carried out the installation of a 45-meter long and 115-ton steel structure for EIFFAGE METAL.
This impressive operation involved transporting the framework from the factory located in Fos-sur-Mer to Châteauneuf-Les-Martigues, where the framework was fitted on its supports.

Date
2010
localisation
Châteauneuf-Les-Martigues, France