Pose des passerelles
Pose des passerelles
212-2-22022019-_DSC3876
212-3-22022019-_DSC3919
212-4-22022019-_DSC3926
212-5-22022019-_DSC3983-copie
previous arrow
next arrow

Installation of the footbridges on the Quai Pyrotechnique for BIT, a Bouygues TP subcontract

On behalf of the French Navy, and as a sub-contractor of Bouygues, Negri installed 5 spans of the “Warren” metal bridge.
This operation was carried out in one week to the great satisfaction of all those involved.

Date
2010
localisation
Châteauneuf-Les-Martigues, France